WalkerBai were engaged by Conrad Gargett on behalf of Queensland Rail, to provide the fire engineering for the Dakabin Station Upgrade as part of the Queensland Rail Station Accessibility Upgrade Program. The scope of works included an accessibility upgrade to the existing station, including the two platforms and adjoining facilities and new overpass, as ll as a new dedicated open deck carpark built adjacent to the station. Fire engineering solutions were used to provide Performance based travel distances and widths from both the platforms and car park, as well as to increase the efficiency of the design with respect to several aspects of the provided fire services.
Project Details
Location: Dakabin Station, Dakabin, QLD
Engineering Disciplines
- Fire Engineering